Mukhtar Kabuka was the project manager for this extensive project. The work consisted of the construction of a new media center, six new classroom buildings, new education suite, and a new art and music suite building. It also included safety to life alteration, new covered walkway connecting the new and existing facilities, Work also included renovating the existing library, the administrative offices, the cafeteria, water pressure cleaning existing school, repainting both the interior and exterior of buildings, upgrading existing restrooms, and upgrading school to be handicapped accessible. Replaced all exterior doors and all the acoustical ceiling panels to all classrooms. Upgraded the electrical and lighting systems, the master clock system, the fire protection alarm system, and the security alarm system. The following site work was also included: new landscaping, enclosed Telco frame equipment, new fences, soft surface under climbing equipments, relocation of the play ground area, resurfacing of existing parking lot, providing new parking area, construction of a new chiller and pump building, providing a new water main line and fire hydrants, and providing a new main sewer line and lift station.
Construction Cost: $4.1 Million
Owner: The Dade County School Board
|